During April 2024 we carried out a repair over an office/workshop in Wickham, Fareham, Hampshire.
Upon Inspection it was noticed that a number of the fixings that secure the ridge had come loose and that some of the foam fillers were missing.
To cure the leaks we fitted a new purpose manufactured plastisol coated steel ridge complete with new fixings, foam fillers and sealant.
The ridge was larger than the original ridge to ensure that all the old fixing holes were covered over.