During February 2025 we carried out repairs to an industrial Unit in Tadworth, Surrey.
The original gutter and the cladding above the windows were causing leaks in the front office.
We therefore cleaned the gutters and then fitted new flexible Firestone gutter liner complete with new outlets to a total length of approximately 10 linear metres (1 no. gutter).
Above the windows we fitted new silver coloured steel flashings to divert the water away from the top of the windows.