During November we carried out a repair over offices/warehouse in Slinfold, Horsham, West Sussex.
Upon Inspection it was noticed that the ridge was rusting badly and that a number of the fixings that secure the ridge had come loose.
In a couple of places the ridge had rusted through completely.
To cure the leaks we removed the existing ridge and fitted a new purpose manufactured plastisol coated steel ridge complete with new fixings and sealant.
The ridge was larger than the original ridge to ensure that all the old fixing holes were covered over.