During November 2024 we carried out repairs to a factory/office roof in Edenbridge, Kent.
The existing concrete gutter was leaking badly and was starting to break down.
We therefore cleaned and prepared the gutter and then fitted a new flexible Firestone gutter liner complete with new outlets to a total length of approximately 18 linear metres. A new steel flashing was also fitted to the outside of the gutter to secure the liner and help preserve the original concrete.