During April 2019, we carried out a vertical cladding contract in Larkfield, Kent.
The existing cladding was badly dented to the front and had faded on the side.
A metal grid system was supplied and fitted to 2 no. walls of the building.
New Wedgewood Blue plastisol coated steel cladding (as chosen by the client from a range of standard colours) was fixed to the grid system using new fixings.
Matching blue flashings were fitted at the doors, gables and corners.
These new flashings enhance the appearance as well as ensuring the cladding is effectively sealed.
The first 2 no. pictures show the finished cladding with the 3rd picture shows how it looked before.