During February 2023, we carried out repair work to a school in East Grinstead, West Sussex.
Leaks were occurring around the pipes that protruded through the roof surface over the boiler room.
New ski-slope flashings were fitted along with new rubberised pipe flashings to ensure the area was effectively sealed.