During September 2019, we undertook repair work at a University in Brighton, West Sussex.
Water was leaking through a valley gutter and damaging the interior.
We cleaned out the gutter and fitted a new Firestone Ultraply Membrane gutter liner complete with stop-ends and outlets to a total length of 22 linear metres.
As the paint on the adjacent sheet end-laps were starting to peel we cleaned and prepared the end lap and applied a special advanced silicone paint.