During April 2026, we carried out repair work to a combined Hanger and workshop Units on Brighton Airport, Shoreham, West Sussex.
The eaves gutter to one side was leaking in numerous places including over the hanger doors.
We therefore removed the old gutters and down-pipes and replaced them with new large capacity half round PVC guttering complete with all necessary connectors, brackets, stop-ends and outlets.
We also cleaned out the gutter on the other side and replaced 1 no. leaking connector.
To the roof we carried out 3 no. repairs in the areas of the existing leaks.